This is a restricted product and it can be activated and played ONLY in Argentina.

This is an Xbox One/Xbox Series version of the game.

Add to Wish List

Flowlines VS. EN Argentina Xbox One/Series Digital Key

31 people are viewing this right now

Notify me when this product is available:

Parameters

More Information
Parent SKU K9989
Product Type Games
Genres Puzzle
Languages English
Edition Standard
Platform Xbox One/Series
Region Argentina
Release Date 2021-07-30 00:00:00

Description

If you like classic puzzle video games for 1 or 2 players... we have a lot of stuff for you! Inspired by the very best in the genre, Flowlines Vs. aims at becoming one of the greatest party games out there. We want players to solve puzzles, to compete with others at it, and to play - everywhere and with everyone.

Pair up all the matching sockets on the board by drawing continuous lines, without crossing over other lines or branching off. Cover the entire board while connecting all sockets!
Watch out for time-limited stages, or for the limit on moves you can make per stage!

Go ahead, try it out!

Features:
  • Over 400 levels you can play in, in single player mode or versus multiplayer mode!
  • Atmospheric soundtrack emphasizing on the atmosphere of the game!
  • 50+ amazing graphical themes!
  • Awesome party atmosphere!
  • Easy to play and hard to master.
  • Both adults and children can pick up the game quickly, thanks to the Intuitive tutorial!
  • Get your hands on special rewards available through our Achievement System.

Customer Reviews

Be the first to review this product!